RACI Matrix Examples and How to Make One in PowerPoint

By the Premium Slides team · · 8 min read

Quick answer

A RACI matrix lists tasks down the side and people across the top, with one letter in each cell: R for Responsible (does the work), A for Accountable (owns the result), C for Consulted (gives input) and I for Informed (is kept up to date). Each task needs exactly one A and at least one R.

RACI matrix examples shown with three responsibility assignment matrix slide templates in blue, yellow and brown

Key takeaways

  • RACI stands for Responsible, Accountable, Consulted and Informed.
  • Every task needs exactly one Accountable person and at least one Responsible person.
  • Read the chart by row to find ownership gaps and by column to find overloaded people.
  • In PowerPoint, a normal table with centred letters and a coloured A cell is enough.
  • Use RACI to share out tasks and DACI to make a single decision.

Most project problems are not about skill. They are about two people who both thought the other one was doing it, or five people who all thought they had the final say. A RACI matrix fixes that with one grid: tasks down the side, people across the top, and one letter in each cell.

This guide explains what the four letters mean, the rules that make the grid work, and three RACI matrix examples you can copy. It then shows how to build the chart in PowerPoint and Google Slides, and when a DACI or another variant is the better choice.

What is a RACI matrix?

A RACI matrix is a table that shows, for every task, who is Responsible, who is Accountable, who is Consulted and who is Informed. It is the most common type of responsibility assignment matrix, which is why template sets often carry that longer name.

LetterRoleWhat it meansHow many per task
RResponsibleDoes the workAt least one
AAccountableOwns the result and signs it offExactly one
CConsultedGives input before or during the work (two-way)As few as possible
IInformedIs told about progress or the result (one-way)As many as needed

The difference between R and A confuses most people. The Responsible person does the task. The Accountable person answers for it if it goes wrong, and says "yes, this is done". On a small team the same person is often both, and you can write "A/R" in the cell.

RACI matrix slide template with four coloured column headers for responsible, accountable, consulted and informed, and five task rows with a role name in every cell
A classic layout: the four letters across the top and tasks down the side.

What rules make a RACI chart work?

Every task has exactly one A and at least one R. Those two rules prevent most of the confusion a RACI chart is meant to solve. A few more checks keep the chart honest:

  • Read each row. No A means nobody owns the task. Two As means two people will argue about it.
  • Read each column. A person with an R in almost every row is overloaded. A person with no R or A anywhere may not need to be on the chart.
  • Keep C small. Every Consulted person is someone the team must wait for. If a row has four Cs, ask which two really change the result.
  • Use roles, not only names. "Designer" still makes sense when someone leaves. Add names in a second line if you need them.
  • Use tasks you can finish. "Marketing" is an area. "Write the launch email" is a task.
Checklist for a RACI matrix: exactly one accountable per task, at least one responsible, few consulted, no overloaded person, roles not only names, and tasks with a clear end
Check every row and every column against these rules.

What do RACI matrix examples look like?

Here are three RACI matrix examples for made-up teams: a website redesign, a monthly sales report and a two-person shop. The teams and tasks are invented for illustration, so adapt the roles to your own.

Example 1: a website redesign

A small company is replacing its website. Five roles are involved.

TaskCEOMarketing leadCopywriterDesignerDeveloper
Set goals and budgetARIIC
Write page contentIARCI
Design the pagesCACRC
Build and testIAICR
Approve the launchARIIR

Read it row by row: each task has one A. Read it column by column: the marketing lead is accountable for most of the work, which is right for a project they run, and the CEO steps in only for money and the final launch.

Example 2: a monthly sales report

A RACI does not have to be a big grid. For a short, repeated process, a four-column version is easier to read.

RACI matrix example for a made-up monthly sales report, with columns for task, responsible, accountable, and consulted or informed across four tasks
A compact RACI for a repeated monthly task.

Writing the names into the cells, instead of letters under each person, works well when there are many people but only a few tasks.

Example 3: a two-person online shop

Two founders run a small online shop. One handles products and suppliers, the other handles marketing and customers. Their RACI has only two columns, but it still helps: for each task, one founder is A, so decisions do not wait for a conversation. "Choose new products: A Founder 1, C Founder 2. Reply to complaints: A/R Founder 2, I Founder 1." Even a tiny team saves time when it agrees who decides.

When do you need a RACI matrix?

Make a RACI when more than three people or teams share a piece of work, or when the same question keeps coming up: "Who is doing this?" For a task one person does alone, it adds nothing.

Good moments to build one:

  • At the start of a project, before anyone has assumed a role.
  • When two teams hand work to each other, such as sales passing a new client to support.
  • When something went wrong and the review shows that nobody owned the step that failed.
  • When someone joins or leaves, so their tasks move to a named person instead of disappearing.

Build it with the people on it, not for them. A RACI that the team agreed in a meeting gets used. One that arrives by email gets ignored.

How do you create a RACI chart in PowerPoint?

Insert a table with one column per role plus one for tasks, and one row per task plus a header row. Type the letters, centre them, and colour the cells so the A in each row stands out.

Five steps to create a RACI chart in PowerPoint: insert a table, add roles and tasks, type the letters, centre and colour the cells, and add a legend
The table method, in five steps.

1. Insert the table

On the Home tab, click Layout and choose Title Only. Go to Insert > Table and drag across the grid, or choose Insert Table and type the numbers. For Example 1 that is 6 columns and 6 rows.

2. Add roles and tasks

Type the roles across the header row and the tasks down the first column. On the Table Design tab, keep Header Row and First Column ticked so both stand out.

3. Type the letters

Fill one letter per cell. Press Tab to move to the next cell. Leave a cell empty when a person has no part in that task.

4. Centre and colour

Select the letter cells and use Layout > Center and Center Vertically in the Alignment group. Then click a cell and use Table Design > Shading to fill it. A simple scheme is a strong colour for A, a lighter one for R, and no fill for C and I.

5. Add a legend

Use Insert > Text Box to add one line under the table: "R: Responsible, A: Accountable, C: Consulted, I: Informed." People who see the chart later will not have you there to explain it.

If your RACI already lives in Excel, copy the cells there and in PowerPoint use Home > Paste and choose Keep Source Formatting. To keep a link back to the sheet, choose Paste Special and Paste link instead.

Show the RACI next to the plan. A RACI says who does what. A Gantt chart says when. Put them on two slides next to each other, using the same task names in the same order. Our guide to the Gantt chart in PowerPoint shows how to build the second one.

In Google Slides, use Insert > Table, pick the grid size, and colour cells with the Fill color button in the toolbar. In Keynote, click the Table button in the toolbar and set fills in the Cell tab of the Format sidebar.

RACI matrix vs DACI: which should you use?

Use RACI to share out the work on tasks. Use DACI to make a single decision. DACI stands for Driver, Approver, Contributors and Informed.

Comparison of RACI, used to share out tasks with responsible, accountable, consulted and informed roles, and DACI, used for one decision with a driver, an approver, contributors and informed people
RACI is for doing the work. DACI is for deciding.
  • Driver: runs the decision process, collects input and sets the deadline.
  • Approver: makes the final decision. There is only one.
  • Contributors: give the facts and opinions the decision needs.
  • Informed: are told the result.

A team often needs both. DACI settles "Which supplier do we choose?". RACI then shares out the work that follows.

You will also meet other variants. RASCI adds S for Support, people who help the Responsible person. RACIQ adds Q for a quality reviewer. PACSI uses Perform, Accountable, Control, Suggest and Informed. Choose the simplest one your team will actually use.

RACIQ matrix slide template with five role columns marked A to E and a row of R, A, C, I and Q letters for each task, with the right letter highlightedPACSI matrix slide template with seven role columns and five task rows filled with the letters P, A, C and S, and a legend for perform, accountable, control, suggest and inform
Two variants: RACIQ with a quality reviewer and PACSI.

What should a RACI matrix PowerPoint template include?

A good RACI matrix PowerPoint template gives you a ready table with coloured headers for each letter, room for five to seven tasks, and a legend. That covers most project slides. Larger charts belong in a spreadsheet, with one summary slide in the deck.

Six responsibility assignment matrix slide templates with role columns, task rows, and coloured R, A, C and I markers in different styles
RACI matrix layouts in several styles, ready to fill.

The assignment matrix templates include RACI, RACIQ and PACSI layouts in letter, label and dot styles. For the slides around the RACI, the project status templates report progress, the Gantt chart templates show timing, and the organogram templates show who reports to whom.

A RACI is usually shown at the start of a project, so it fits the project kickoff presentation. To decide who belongs on the chart in the first place, a stakeholder analysis matrix helps.

How do you build a RACI slide faster?

The thinking behind a RACI takes one meeting: list the tasks, list the roles, agree one A per row. The slide should not take longer than the meeting, but coloured headers, even cells and a clean legend often do.

Premium Slides is one bundle of 5,000+ animated, fully editable slides for PowerPoint, Google Slides and Keynote. It includes assignment matrix, project status, Gantt chart and organogram layouts, so you pick a RACI design and type in your own tasks and roles. The bundle costs $19.99 as a one-time payment, with instant download and lifetime access. You can get the bundle here or browse the template categories first.

Frequently asked questions

What is the difference between Responsible and Accountable?

The Responsible person does the work. The Accountable person owns the result, signs it off and answers for it. On small teams one person is often both.

Can a task have two Accountable people?

No. The point of the A is that one person has the final say. If two people share it, decisions stall.

What is the difference between RACI and DACI?

RACI shares out the work on tasks. DACI, which stands for Driver, Approver, Contributors and Informed, is used to make one decision.

How many tasks should a RACI slide show?

About five to seven tasks fit on one readable slide. Keep the full chart in a spreadsheet and show a summary in the deck.

Can you make a RACI chart in Google Slides?

Yes. Use Insert > Table, type the roles and tasks, add the letters and colour the cells with the Fill color button.